Your first 30 days

The 30-day onboarding program for workspace owners and admins: the setup checklist, the milestones kanman tracks, its reminders, and the review call at the end of the month.

Every new workspace starts a 30-day program. It gives owners and admins one place to see what is set up, what kanman has already delivered, and what comes next. You find it under Workspace settings > Onboarding.

The setup checklist

Five steps, each with a link to the page where you do it. kanman ticks a step as soon as it is set up, so the list always shows the real state of your workspace:

Step What it means Where you do it
First team A team is where kanman takes on work: its repositories, its people and its chat. Set up a team
Connections Your code host, tracker or wiki, so kanman can read and deliver work. Workspace settings > Connections
Single sign-on People sign in with your identity provider. Workspace settings > Single sign-on
Governance rules Which changes need a person’s approval. Set per team. Team > Limits and rules, see Risk tiers
Runner Needed when runs stay in your own network; optional otherwise. Self-hosted runner

The milestones

The program card shows the day you are on and three milestones, each with its date:

  • Day 1: first answer. kanman answers its first question in your workspace.
  • Day 7: first merged change. kanman merges its first change into one of your repositories.
  • Day 30: review call. A short call to look back and decide what’s next.

A milestone shows as done (with its date), coming up, or not yet. The card also shows how long it took until kanman’s first verified outcome: a change that was merged, kept your main branch green, was not reverted and passed its checks.

Reminders

On days 1, 3, 7, 14 and 25 kanman writes a short message in each owner’s and admin’s own chat: the day of the program, how many setup steps are done, and the next one, with a link to the checklist. If you have not read it, your email digest carries it.

Reminders only go out on working days from 9:00 in your time zone. A reminder that falls on a weekend waits for Monday. No other channel is used.

The 30-day review

The review card holds the call’s agenda:

  1. What kanman delivered: verified outcomes, merged changes and their review times.
  2. What’s set up and what’s still open on the checklist.
  3. Where people waited on kanman, or kanman on them.
  4. The next 30 days: teams, connections and work to add.
  5. Decisions: who owns what, and when you look again.

By day 25 kanman prepares a short report of your first 30 days for the call, in the same format as the value reports. Open it from the review card. After the call, select Mark the review as held.

Workspaces created before the program existed see the checklist only.

Last updated: January 1, 0001

Open kanman